What we do

Expertise

Six disciplines, one LOD-driven process. Tap a service to see how it runs from concept through as-built handover.

  • Concept stage: LOD 100, massing and spatial layout
  • Design development: LOD 200 to 300, generic to specific elements
  • Coordination stage: LOD 350, system interfaces with MEP and structure
  • Construction documentation: LOD 400, fabrication level detail where required
  • Handover: LOD 500, as built model matching constructed reality
  • BEP alignment: model progression tracked against BEP milestones at each stage
  • 4D linkage: architectural elements sequenced against construction programme when 4D is scoped
  • Sheet production and drawing sets at every stage
  • As built documentation at closeout
  • Concept stage: LOD 100 to 200, layout and space planning
  • Development stage: LOD 300, joinery, finishes, fixed furniture
  • Coordination: clash checks against MEP and architecture before procurement
  • Construction stage: LOD 400 where fabrication detail is needed
  • Handover: LOD 500, as built fitout model
  • FM relevant data tagged at handover for interior assets like fixed furniture and finishes
  • Concept stage: LOD 100, system zoning and space allocation
  • Design development: LOD 200 to 300, routing and equipment sizing
  • Coordination stage: LOD 350, system interface modelling, this is where most clash detection happens
  • Construction stage: LOD 400, shop drawing level detail
  • Handover: LOD 500, as built MEP model
  • 5D linkage: quantities extracted from MEP model for cost estimation, when 5D is scoped
  • COBie data structured through the project, not just at the end: equipment tags, asset data and maintenance schedules built into the model as it develops
  • FM handover: structured COBie export mapped to client FM system at project closeout
  • BEP defines who inputs what COBie fields and when, this should be set at BEP stage, not left to handover
  • Concept stage: LOD 100, site zoning and hardscape softscape layout
  • Development stage: LOD 200 to 300, planting, paving, drainage coordination
  • Coordination: site wide clash checks with architecture and MEP
  • Handover: LOD 500, as built landscape model
  • FM data for irrigation systems and landscape assets where applicable
  • Concept stage input: design intent, spatial strategy
  • Design development review: buildability checks against model progression
  • Ongoing alignment between design intent and BIM output through LOD stages
  • Concept development for interior spaces
  • Material and finish direction
  • Coordination handoff into fitout BIM at LOD 300 stage
How a project runs
01 / SET STANDARDS

BIM Execution Plan

We agree the modelling standard, LOD targets and file structure with every discipline before a single wall gets drawn.

02 / FEDERATE

Build the model

Discipline models are combined into one federated model on a fixed coordination cycle, weekly on active projects.

03 / INTERROGATE

Detect & resolve

Clash reports go to the responsible discipline with a deadline. Nothing reaches IFC status with an open clash.

04 / HAND OVER

Deliver the twin

As-built models and documentation are packaged for facilities management: an asset that keeps working after completion.

Bring us in early. That's when we save you the most.

Start a project →